Pandan-Gemenche-tampin-simpang Ampat-pandan

Technical sheet

53403658
Creation
Last update
  • Road biking
    Activity: Road biking
  • ↔
    Distance: 118.25 km
  • ◔
    Author’s time: Duration unknown 
  • ▲
    Difficulty: Not specified

  • ⚐
    Return to departure point: Yes
  • ↗
    Vertical gain: + 596 m
  • ↘
    Vertical drop: - 603 m

  • ▲
    Highest point: 160 m
  • ▼
    Lowest point: 2 m
  • ⚑
    Start/End: N 2.28724° / E 102.26205°

  • ◶
    Path proportions: Not specified

  • Today’s forecast: … Loading…

Description

Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.

(S) From here, describe the instructions to follow from the starting point.

Add waypoints by clicking on the map.

The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).

Waypoints

  1. S/E : km 0 - alt. 22 m - Start near 142, Kampung Gangsa, 76100 Durian Tunggal, Melaka, Malaysia
  2. 2 : km 8.91 - alt. 24 m - Continue onto Jalan Simpang Gading / Ayer Pasir/M19
  3. 3 : km 16.77 - alt. 44 m - Turn right onto Jalan Ayer Pasir / Selandar/M8
  4. 4 : km 21.98 - alt. 51 m - At the roundabout, take the 1st exit onto Jalan Selandar / Batang Melaka/M13
  5. 5 : km 34.1 - alt. 102 m - Turn left onto N18
  6. 6 : km 34.36 - alt. 101 m - N18 turns slightly right and becomes N13
  7. 7 : km 40.67 - alt. 61 m - Turn left onto Jalan Tampin-Gemas/Route 1
  8. 8 : km 66.39 - alt. 48 m - Turn right onto Jalan Seremban - Tampin/Route 1
  9. 9 : km 72.19 - alt. 55 m - Turn left onto Route 19
  10. 10 : km 77.7 - alt. 40 m - At the roundabout, take the 3rd exit onto Lebuh AMJ/Route 19
  11. 11 : km 83.58 - alt. 20 m - Continue straight onto Lebuh AMJ
  12. 12 : km 106.15 - alt. 8 m - Turn right onto Jalan Pandan/M3
  13. 13 : km 107.12 - alt. 6 m - Turn right onto Jalan Taman Seri Pandan
  14. 14 : km 107.16 - alt. 5 m - Turn left onto Jalan Sp1
  15. 15 : km 107.29 - alt. 7 m - Turn left toward Jalan Pandan/M3
  16. 16 : km 107.31 - alt. 7 m - Turn left at the 1st cross street onto Jalan Pandan/M3
  17. 17 : km 108.3 - alt. 7 m - Turn left onto Jalan Malim
  18. 18 : km 108.42 - alt. 7 m - Merge onto Lebuh AMJ/Route 19
  19. 19 : km 109.01 - alt. 8 m - Take the exit toward Pokok Mangga/Malim Jaya/Batu Berendam
  20. 20 : km 109.29 - alt. 7 m - Turn right onto Jalan Malim Jaya
  21. 21 : km 111.24 - alt. 7 m - At the roundabout, take the 3rd exit onto Jalan Tun Fatimah
  22. 22 : km 112.31 - alt. 5 m - Turn left onto Route 142
  23. 23 : km 114.77 - alt. 7 m - At the roundabout, take the 2nd exit onto Jalan Batu Berendam/Route 142
  24. 24 : km 117.02 - alt. 18 m - At the roundabout, take the 2nd exit onto Jalan Tunku Abd Rahman/Route 142
  25. S/E : km 118.25 - alt. 22 m

Useful Information

Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.

The GPS track and description are the property of the author.

Loading…