KK BUtterworth

Technical sheet

56160583
Creation
Last update
  • Road biking
    Activity: Road biking
  • ↔
    Distance: 115.74 km
  • ◔
    Author’s time: Duration unknown 
  • ▲
    Difficulty: Not specified

  • ⚐
    Return to departure point: No
  • ↗
    Vertical gain: + 128 m
  • ↘
    Vertical drop: - 170 m

  • ▲
    Highest point: 165 m
  • ▼
    Lowest point: 0 m
  • ⚑
    Start: N 4.77177° / E 100.92449°
  • ⚑
    End: N 5.3945° / E 100.36447°

  • ◶
    Path proportions: Not specified

  • Today’s forecast: … Loading…

Description

Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.

(S) From here, describe the instructions to follow from the starting point.

Add waypoints by clicking on the map.

The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).

Waypoints

  1. S : km 0 - alt. 50 m - Start near 54, Jalan Dato Sagor, Taman Suria, 33000 Kuala Kangsar, Perak, Malaysia
  2. 2 : km 0.07 - alt. 50 m - Turn left toward Jalan Taiping/Route 1
  3. 3 : km 0.1 - alt. 49 m - Turn left onto Jalan Taiping/Route 1
  4. 4 : km 10.89 - alt. 77 m - Continue straight to stay on Route 1
  5. 5 : km 23.83 - alt. 18 m - Turn left onto Jalan Changkat Jering - Sri Manjung - Kampung Koh/Route 60
  6. 6 : km 24.54 - alt. 16 m - Turn right
  7. 7 : km 24.83 - alt. 17 m - Keep right at the fork and merge onto Lebuhraya Utara - Selatan/AH2/E1
  8. 8 : km 40.24 - alt. 6 m - Take exit 148-Taiping (U) toward Kamunting/Taiping
  9. 9 : km 41.22 - alt. 10 m - Keep right to continue toward Route 3146
  10. 10 : km 41.52 - alt. 8 m - Turn left onto Jalan Taiping - Bagan Serai/Route 1
  11. 11 : km 57.53 - alt. 6 m - Turn left
  12. 12 : km 57.55 - alt. 6 m - Turn left onto Jalan Taiping - Bagan Serai/Route 1
  13. 13 : km 80.49 - alt. 4 m - Continue straight to stay on Route 1
  14. 14 : km 87.03 - alt. 8 m - Continue straight onto Jalan Sungai Bakap/Route 1
  15. 15 : km 109.98 - alt. 4 m - Continue straight onto Jalan Baru/Route 1
  16. 16 : km 112.03 - alt. 10 m - Keep right to continue on Lebuhraya Lingkaran Luar Butterworth/E17, follow signs for Sg. Dua/Butterworth/Dermaga Dalam
  17. 17 : km 114.56 - alt. 7 m - Take exit 1703 toward Butterworth/Terminal Feri/Perai
  18. 18 : km 114.84 - alt. 5 m - Turn left
  19. 19 : km 115.48 - alt. 2 m - Keep right
  20. E : km 115.74 - alt. 6 m

Useful Information

Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.

The GPS track and description are the property of the author.

Loading…