Description
Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.
(S) From here, describe the instructions to follow from the starting point.
Add waypoints by clicking on the map.
The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).
Waypoints
- S/E : km 0 - alt. 14 m
- 1 : km 0.49 - alt. 15 m - Turn right
- 2 : km 0.84 - alt. 26 m - Turn sharp right onto Cycle Path at Lingkaran Ilmu UTM
- 3 : km 1.35 - alt. 30 m - Turn left onto Jalan Meranti
- 4 : km 2.11 - alt. 22 m - Turn right onto Jalan Meranti
- 5 : km 2.31 - alt. 23 m - Keep right onto Jalan Cengal
- 6 : km 2.48 - alt. 26 m - Drinking Checkpoint
- 7 : km 2.67 - alt. 34 m - Turn right onto Jalan Cengal
- 8 : km 3.34 - alt. 31 m - Turn left onto Jalan Amal
- 9 : km 4.26 - alt. 25 m - Turn right onto Lingkaran Ilmu
- 10 : km 4.33 - alt. 26 m - Turn sharp left onto Jalan Kempas 1
- 11 : km 4.75 - alt. 27 m - Turn left onto Jalan Kempas
- 12 : km 4.76 - alt. 27 m - Turn left onto Jalan Kempas 1
- 13 : km 5.07 - alt. 15 m - Turn left
- S/E : km 5.13 - alt. 14 m
Useful Information
Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.
The GPS track and description are the property of the author.
Loading…