-
Activity:
Road biking
-
Distance:
48.72 km
-
Author’s time:
Duration unknown
-
Difficulty:
Not specified
-
-
Return to departure point:
Yes
-
Vertical gain:
+ 96 m
-
Vertical drop:
- 97 m
-
-
Highest point:
40 m
-
Lowest point:
4 m
Description
Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.
(S) From here, describe the instructions to follow from the starting point.
Add waypoints by clicking on the map.
The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).
Waypoints
- S/E : km 0 - alt. 14 m - Start on
- 2 : km 0.06 - alt. 14 m - Turn left
- 3 : km 0.08 - alt. 13 m - Turn slight left
- 4 : km 0.32 - alt. 16 m - Keep left
- 5 : km 1.85 - alt. 10 m - Keep right onto Lebuhraya Muara–Tutong
- 6 : km 6.76 - alt. 18 m - Keep left onto Lebuhraya Tungku
- 7 : km 15.88 - alt. 9 m - Keep left
- 8 : km 16.05 - alt. 8 m - Keep left
- 9 : km 17.24 - alt. 5 m - Keep left onto Jalan Menteri Besar
- 10 : km 18.35 - alt. 6 m - Keep right
- 11 : km 18.37 - alt. 6 m - Turn right onto Jalan Pembangunan
- 12 : km 18.64 - alt. 11 m - At roundabout, take exit 1 onto Jalan Muhibbah
- 13 : km 19.03 - alt. 8 m - At roundabout, take exit 2 onto Jalan Muhibbah
- 14 : km 19.24 - alt. 9 m - At roundabout, take exit 2 onto Jalan Lapangan Terbang Lama
- 15 : km 19.84 - alt. 11 m - Keep right onto Jalan Lapangan Terbang Lama
- 16 : km 19.9 - alt. 14 m - Turn right onto Jalan Perdana Menteri
- 17 : km 22.06 - alt. 7 m - Keep right onto Jalan Kumbang Pasang
- 18 : km 22.75 - alt. 6 m - Keep left
- 19 : km 24.11 - alt. 13 m - Enter roundabout
- 20 : km 24.98 - alt. 11 m - Turn slight left onto Jalan Stoney
- 21 : km 25.33 - alt. 8 m - Keep left
- 22 : km 25.91 - alt. 6 m - Turn right onto Jalan Haji Basir
- 23 : km 26.59 - alt. 6 m - Keep left onto Jalan Kumbang Pasang
- 24 : km 27.6 - alt. 10 m - Keep right onto Jalan Kumbang Pasang
- 25 : km 28.73 - alt. 11 m - Keep left
- 26 : km 29.44 - alt. 9 m - At roundabout, take exit 1 onto Jalan Muhibbah
- 27 : km 29.64 - alt. 8 m - At roundabout, take exit 1 onto Jalan Landasan Lama
- 28 : km 30.01 - alt. 8 m - At roundabout, take exit 3 onto Jalan Pembangunan
- 29 : km 30.67 - alt. 11 m - At roundabout, take exit 2 onto Jalan Pembangunan
- 30 : km 31.23 - alt. 6 m - Turn slight left onto Jalan Menteri Besar
- 31 : km 31.42 - alt. 8 m - Keep left
- 32 : km 32.52 - alt. 11 m - Keep left onto Lebuhraya Tungku
- 33 : km 41.51 - alt. 20 m - Keep left
- 34 : km 46.37 - alt. 19 m - Keep right onto Lebuhraya Muara–Tutong
- 35 : km 48.15 - alt. 18 m - Keep left
- 36 : km 48.48 - alt. 13 m - Keep left
- 37 : km 48.63 - alt. 14 m - Turn sharp right
- 38 : km 48.66 - alt. 14 m - Turn slight left
- S/E : km 48.72 - alt. 14 m
Useful Information
Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.
The GPS track and description are the property of the author.
Loading…