EasyRide

Technical sheet

54679789
Creation
Last update
  • Road biking
    Activity: Road biking
  • ↔
    Distance: 48.72 km
  • ◔
    Author’s time: Duration unknown 
  • ▲
    Difficulty: Not specified

  • ⚐
    Return to departure point: Yes
  • ↗
    Vertical gain: + 96 m
  • ↘
    Vertical drop: - 97 m

  • ▲
    Highest point: 40 m
  • ▼
    Lowest point: 4 m
  • ⚑
    Start/End: N 4.937864° / E 114.833753°

  • ◶
    Path proportions: Not specified

  • Today’s forecast: … Loading…

Description

Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.

(S) From here, describe the instructions to follow from the starting point.

Add waypoints by clicking on the map.

The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).

Waypoints

  1. S/E : km 0 - alt. 14 m - Start on
  2. 2 : km 0.06 - alt. 14 m - Turn left
  3. 3 : km 0.08 - alt. 13 m - Turn slight left
  4. 4 : km 0.32 - alt. 16 m - Keep left
  5. 5 : km 1.85 - alt. 10 m - Keep right onto Lebuhraya Muara–Tutong
  6. 6 : km 6.76 - alt. 18 m - Keep left onto Lebuhraya Tungku
  7. 7 : km 15.88 - alt. 9 m - Keep left
  8. 8 : km 16.05 - alt. 8 m - Keep left
  9. 9 : km 17.24 - alt. 5 m - Keep left onto Jalan Menteri Besar
  10. 10 : km 18.35 - alt. 6 m - Keep right
  11. 11 : km 18.37 - alt. 6 m - Turn right onto Jalan Pembangunan
  12. 12 : km 18.64 - alt. 11 m - At roundabout, take exit 1 onto Jalan Muhibbah
  13. 13 : km 19.03 - alt. 8 m - At roundabout, take exit 2 onto Jalan Muhibbah
  14. 14 : km 19.24 - alt. 9 m - At roundabout, take exit 2 onto Jalan Lapangan Terbang Lama
  15. 15 : km 19.84 - alt. 11 m - Keep right onto Jalan Lapangan Terbang Lama
  16. 16 : km 19.9 - alt. 14 m - Turn right onto Jalan Perdana Menteri
  17. 17 : km 22.06 - alt. 7 m - Keep right onto Jalan Kumbang Pasang
  18. 18 : km 22.75 - alt. 6 m - Keep left
  19. 19 : km 24.11 - alt. 13 m - Enter roundabout
  20. 20 : km 24.98 - alt. 11 m - Turn slight left onto Jalan Stoney
  21. 21 : km 25.33 - alt. 8 m - Keep left
  22. 22 : km 25.91 - alt. 6 m - Turn right onto Jalan Haji Basir
  23. 23 : km 26.59 - alt. 6 m - Keep left onto Jalan Kumbang Pasang
  24. 24 : km 27.6 - alt. 10 m - Keep right onto Jalan Kumbang Pasang
  25. 25 : km 28.73 - alt. 11 m - Keep left
  26. 26 : km 29.44 - alt. 9 m - At roundabout, take exit 1 onto Jalan Muhibbah
  27. 27 : km 29.64 - alt. 8 m - At roundabout, take exit 1 onto Jalan Landasan Lama
  28. 28 : km 30.01 - alt. 8 m - At roundabout, take exit 3 onto Jalan Pembangunan
  29. 29 : km 30.67 - alt. 11 m - At roundabout, take exit 2 onto Jalan Pembangunan
  30. 30 : km 31.23 - alt. 6 m - Turn slight left onto Jalan Menteri Besar
  31. 31 : km 31.42 - alt. 8 m - Keep left
  32. 32 : km 32.52 - alt. 11 m - Keep left onto Lebuhraya Tungku
  33. 33 : km 41.51 - alt. 20 m - Keep left
  34. 34 : km 46.37 - alt. 19 m - Keep right onto Lebuhraya Muara–Tutong
  35. 35 : km 48.15 - alt. 18 m - Keep left
  36. 36 : km 48.48 - alt. 13 m - Keep left
  37. 37 : km 48.63 - alt. 14 m - Turn sharp right
  38. 38 : km 48.66 - alt. 14 m - Turn slight left
  39. S/E : km 48.72 - alt. 14 m

Useful Information

Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.

The GPS track and description are the property of the author.

Loading…