Gasing428m PaR R3

Deleted wrong turn to the platform
Plot a Route with Turn by Turn

Technical sheet

55074721
Creation
Last update
  • Walking
    Activity: Walking
  • ↔
    Distance: 4.99 km
  • ◔
    Calculated time: 1h 55 
  • ▲
    Difficulty: Not specified

  • ⚐
    Return to departure point: No
  • ↗
    Vertical gain: + 177 m
  • ↘
    Vertical drop: - 171 m

  • ▲
    Highest point: 140 m
  • ▼
    Lowest point: 47 m
  • ⚑
    Start: N 3.095848° / E 101.663037°
  • ⚑
    End: N 3.097002° / E 101.661503°

  • Today’s forecast: … Loading…

Description

Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.

(S) From here, describe the instructions to follow from the starting point.

Add waypoints by clicking on the map.

The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).

Waypoints

  1. S : km 0 - alt. 47 m - Start on
  2. 2 : km 0.03 - alt. 49 m - Turn left
  3. 3 : km 0.1 - alt. 63 m - Keep right
  4. 4 : km 0.11 - alt. 65 m - Turn right
  5. 5 : km 0.24 - alt. 79 m - Turn left
  6. 6 : km 0.47 - alt. 61 m - Turn right onto Bukit Gasing Valley Trail
  7. 7 : km 0.5 - alt. 63 m - Turn left onto Sivan Temple Trail 3
  8. 8 : km 0.83 - alt. 139 m - Turn left
  9. 9 : km 0.9 - alt. 132 m - Turn left
  10. 10 : km 0.97 - alt. 122 m - Turn slight left
  11. 11 : km 1.03 - alt. 111 m - Turn sharp left
  12. 12 : km 1.08 - alt. 118 m - Turn right
  13. 13 : km 1.11 - alt. 115 m - Turn left
  14. 14 : km 1.24 - alt. 98 m - Turn left
  15. 15 : km 1.58 - alt. 56 m - Turn left
  16. 16 : km 1.65 - alt. 60 m - Turn left onto Bukit Gasing Valley Trail
  17. 17 : km 1.69 - alt. 62 m - Turn left
  18. 18 : km 1.7 - alt. 61 m - Turn right onto Bukit Gasing Valley Trail
  19. 19 : km 1.97 - alt. 75 m - Turn sharp right - Platform
  20. 20 : km 2 - alt. 76 m - Turn right
  21. 21 : km 2.13 - alt. 97 m - Turn right
  22. 22 : km 2.18 - alt. 96 m - Keep left
  23. 23 : km 2.19 - alt. 94 m - Turn sharp left onto Fence Trail
  24. 24 : km 2.54 - alt. 106 m - Turn right onto Bukit Gasing Backbone
  25. 25 : km 3 - alt. 85 m - Turn left Labah-Labah
  26. 26 : km 3.34 - alt. 98 m - Turn right
  27. 27 : km 3.36 - alt. 100 m - Turn left onto Suspension Bridge Loop
  28. 28 : km 3.63 - alt. 76 m - Turn slight right onto Suspension Bridge Loop
  29. 29 : km 3.76 - alt. 86 m - Turn right onto Suspension Bridge Loop
  30. 30 : km 4.17 - alt. 98 m - Turn slight left onto Bukit Gasing Backbone
  31. 31 : km 4.18 - alt. 98 m - Turn slight right onto Bukit Gasing Backbone
  32. 32 : km 4.35 - alt. 104 m - Turn left
  33. 33 : km 4.53 - alt. 103 m - Turn slight right
  34. 34 : km 4.58 - alt. 95 m - Turn right
  35. 35 : km 4.69 - alt. 72 m - Turn slight left
  36. E : km 4.99 - alt. 50 m

Useful Information

Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.

The GPS track and description are the property of the author.

Loading…